Kuramae Orange Library closes November 1–12 after elevator reopening

A separate library system update closes the library through November 12. All library services except book-post returns stop during the closure.

Updated Official information checked

Added the November 1–12 closure for the library system replacement.

As checked on November 7, 2026, resumed elevator access does not mean the library is open. The official notice updated September 16 closes all Taito libraries November 1–12 for a system update and stops all library services except book-post returns. Reopening is announced for November 13. Distinguish elevator access from the library opening calendar.

Taito City Library's notice dated September 8, 2026 announced that elevator work at Kankyo Fureai-kan Himawari was complete and elevator service to Kuramae Orange Library would resume that day. The construction details below retain that historical announcement.

The original construction plan ran from June 15 through late October 2026 and required stairs to the sixth-floor library. That former stair-only advice no longer describes current access after the work finished.

The library is on the sixth floor of Kankyo Fureai-kan Himawari in Kuramae 4-chome. Regular hours are Tuesday–Sunday, 10 a.m.–6 p.m., with no reading or study seats. Resumed elevator access changes the route to the sixth floor; it does not announce new seating.

Source: Taito City Library

くらまえオレンジ図書館

東京都台東区蔵前4丁目14番6号 環境ふれあい館ひまわり6階